Sustainable Value Chains: publications

I. Beiträge zu Fachzeitschriften / Journal Contributions / Contributions dans des revues spécialisées

 

A. Begutachtete Beiträge / Reviewed Contributions / Contributions examinées

  • Fröhling, M.; Schwaderer, F.; Bartusch, H.; Schultmann, F.: A material flow-based approach to enhance resource efficiency in production and recycling networks. Beitrag für Journal of Industrial Ecology (conditionally accepted).
  • Trippe, F.; Fröhling, M.; Schultmann, F.; Stahl, R.; Henrich, E.: Techno-economic assessment of gasification as a process step within biomass-to-liquid (BtL) fuel and chemicals production. Beitrag für Fuel Processing Technology (akzeptiert).
  • Fröhling, M.; Schwaderer, F.; Bartusch, H.; Rentz O. (2010): Integrated Planning of Trans­por­tation and Recycling for multiple Plants based on Process Simulation. In: European Journal of Operational Research, 207 (2010) 2, S. 958-970.
  • Trippe, F.; Fröhling, M.; Schultmann, F.; Stahl, R.; Henrich, E. (2010): Techno-economic analysis of fast pyrolysis as process step within a biomass-to-liquid (BtL) fuel production. In: Waste and Biomass Valorization 1 (2010) 4, S. 415-430.
  • Fröhling, M.; Rentz, O. (2010): A Case Study on Raw Material Blending for the Recycling of Ferrous Wastes in a Blast Furnace, in: Journal of Cleaner Production, 18 (2010) 2, S. 161-173.
  • Schultmann, F.; Fröhling, M.; Rentz, O. (2006): A fuzzy approach for production planning and detailed scheduling in paints manufacturing, in: International Journal of Production Research (IJPR) 44 (2006) 8, S. 1589-1612.
  • Schultmann, F.; Zumkeller, M.; Rentz, O. (2006): Modeling reverse logistic tasks within closed-loop supply chains: An example from the automotive industry, in: European Journal of Opertional Research (EJOR) 171 (2006) S. 1033-10507.
  • Schultmann, F.; Zumkeller, M.; Fröhling, M.; Rentz, O. (2005): Modellbasierte Transportplanung in Reverse Supply Chains, in: Logistik Management 7 (2005) 1, S. 10-24.
  • Schultmann, F.; Engels, B.; Rentz, O.(2004): Flowsheeting-based simulation of recycling concepts in the metal industry, in: Journal of Cleaner Production 12 (2004) 7, S. 737-751
  • Schultmann, F.; Engels, B.; Rentz, O. (2003): Closed-loop Supply Chains for Spent Batteries, in: Interfaces - Special Selection: Closed-Loop Supply Chains: Practice and Potential - 33 (2003) 6, S. 57-71
  • Schultmann, F.; Fröhling, M.; Rentz, O. (2002): Demontageplanung und -steuerung mit Enterprise-Resource- und Advanced-Planning-Systemen, in: Wirtschaftsinformatik, 44 (2002) 6, S. 557-565, Abstract
  • Schultmann, F.; Rentz, O. (2002): Scheduling of deconstruction projects under resource constraints in: Construction Management and Economics 20 (2002) 5, S. 391-401
  • Schultmann, F.; Jochum R.; Rentz, O. (2002): Stoffstrombasierte Investitionsplanung für industrielle Produktionsanlagen zur Bewertung betrieblicher Emissionsminderungsmaßnahmen, in: Zeitschrift für Planung 13 (2002) 1, S. 1-26
  • Schultmann, F.; Schmittinger, A.; Rentz, O. (2001): Modellierung und Simulation betrieblicher Stoff- und Energieströme mittels fuzzyfizierter Petri-Netze - dargestellt für Produktionsanlagen der keramischen Industrie, in: Zeitschrift für Planung 12 (2001) 3, S. 261-281
  • Halog, A.; Schultmann, F.; Rentz, O. (2001): Using Quality Function Deployment for Technique Selection for Optimum Environmental Performance Improvement, in : Journal of Cleaner Production, 9(5): S. 387-394.
  • Schultmann, F.; Rentz, O. (2001): Environment-oriented project scheduling for the dismantling of buildings, in: OR Spektrum (23), S. 51-78
    Schultmann, F.; Jochum, R.; Rentz, O. (2000): A Methodology for the Economic Assessment of Best Available Techniques - Demonstrated for the Case Study Electric Steelmaking, in: International Journal of Life Cycle Assessmant, 6 (1),S. 19-27

 

B. Beiträge auf Basis begutachteter Abstracts bzw. Kurzfassungen / Contributions on the Basis of reviewed Abstracts / Contributions basées sur des résumés examinés

  • Fröhling, M.; Bartusch, H.; Schwaderer, F.; Schultmann, F. (2009): An inter-company Approach to improve Resource and Energy Efficiency and reduce Greenhouse Gas Emissions in Metal Industries by linking Flow Sheet Models, in World of Metallurgy - Erzmetall 62 (2009) No. 5, S. 288 - 298
  • Zumkeller, M.; Schultmann, F.; Fröhling, M.; Rentz, O. (2005): Tragfähige Alternative - Die kosteneffiziente Kreislaufführung von Kunststoffen bietet einen Ansatz zur Umsetzung der Produktverantwortung in der Automobilindustrie, in: Müllmagazin 18 (2005) 1, S. 18-20.
  • Nebel, F.; Schultmann, F.; Fröhling, M.; Rentz, O. (2004): Thermodynamische Modellierung komplexer Produktionsaggregate am Beispiel des Hochofens, in: Chemie Ingenieur Technik, 76 (2004) 9, S. 1344-1345
  • Schultmann, F.; Fröhling, M.; Rentz, O. (2002): Simulationsgestützte Auftragsreihenfolgeplanung auf Basis von Prioritätsregeln, in: PPS Management 7 (2002) 4, S. 21-24
  • Schultmann, F.; Zumkeller, M.; Rentz, O. (2002): Verwertungsoptionen für Brennstoffzellen aus Altfahrzeugen, in Umweltpraxis, Heft 2 (2002) 11, S. 24-26
  • Schultmann, F.; Heese, H. S.; Rentz, O. (2002): Leistungsanalyse elastisch gekoppelter Fliessfertigungssysteme - Vergleich simulationsbasierter und analytischer Verfahren, in: Zeitschrift für wirtschaftlichen Fabrikbetrieb (ZWF) 97 (2002) 4, S. 195-204
  • Schultmann, F.; Engels, B.; Rentz, O. (2002): Stand und Perspektiven der Rücknahme und Verwertung von Batterien - Untersuchung neuer Strukturen zur Schließung von Stoffkreisläufen, in: Müll und Abfall 34 (2002) 8, S. 456-469
  • Schultmann, F.; Jochum, R.; Schmittinger, A.; Rentz, O. (2000): IVU-Richtlinie - Vorgaben an Genehmigung und Betrieb von Produktionsanlagen, in: Umwelt, Bd. 30, Nr. 4/5, Springer-VDI-Verlag, S. 25 - 28
  • Schultmann, F.; Jochum, R.; Schmittinger, A.; Rentz, O. (2000): Beste verfügbare Techniken in der deutschen keramischen Industrie im Hinblick auf die Umsetzung der IVU-Richtlinie, in: Keramische Zeitschrift, Nr. 3, S. 214 - 224
  • Schultmann, F.; Rentz, O. (1999): Stoffstrommanagement für Baureststoffe aus dem Hochbau, in: Müll und Abfall, Nr. 4, S. 206 - 217

 

II. Beiträge in Sammelwerken / Contributions to Books and Proceedings / Contributions aux livres

 

A. Begutachtete Beiträge / Reviewed Contributions / Contributions examinés

  • Fröhling, M.; Schweinle, J.; Meyer, J.-C.; Schultmann, F. (2011): Logistics of renewable raw materials. In: Hirth, T.; Ulber, R.; Sell, D.: Renewable Raw Materials - New Feedstocks for the Chemical Industry, Wiley-VCH, Weinheim S. 49-94.
  • Fröhling, M.; Schwaderer, F.; Rentz, O. (2009): Production Planning under Economic and Ecologic Objectives – A comparison in Case Studies from Metals Production, in: Fleischmann, B.; Borgwardt, K.-H.; Klein, R. (Hrsg.): Operations Research Proceedings 2008: Selected Papers of the Annual International Conference of the German Operations Research Society , Springer, Dordrecht, S. 53-58.
  • Fröhling, M.; Schwaderer, F., Rentz, O. (2008): Ein nichtlinearer Ansatz zur mehrperiodigen Ressourcenallokation beim Zinkrecycling in Wälzrohren. In Mattfeld, D. C., Günther, H.-O.; Suhl, L.; Voß, S. (Hrsg.): Informations- und Kommunikationssysteme in Supply Chain Management, Logistik und Transport, DSOR Beiträge zur Wirtschaftsinformatik, Paderborn, S. 187-206.
  • Fröhling, M.; Bartusch, H.; Rentz, O. (2007): Integrierte Transport- und Verwertungsplanung für Elektrostahlwerksstäube, in: Otto, A.; Obermaier, R.: Logistikmanagement -- Analyse, Bewertung und Gestaltung logistischer Systeme, Deutscher Universitäts-Verlag, Wiesbaden, S.141-160 (erscheint)
  • Fröhling, M., Schultmann, F., Nebel, F., Rentz, O. (2004): Production Planning in the Metal Industry, in: Cagnol, J., Zolesio, J.-P. (Hrsg.): Information Processing: Recent Mathematical Advances in Optimization and Control, Presses de l'Ecole des Mines des Paris, S. 115-126.
  • Schultmann, F.; Zumkeller, M.; Rentz, O. (2004): Tourenplanung zur Gestaltung von Reverse Supply Chains, in: Spengler, Th.; Voss, S., Kopfer, H. (Hrsg.): Logistik Management. Prozesse-Systeme-Ausbildung. Physica Verlag, Heidelberg, 2004, S. 349-362
  • Schultmann, F.; Rentz, O. (2003): Fuzzy Scheduling for the Dismantling of Complex Products, in: Leopold-Wildburger, U.; Rendl. F.; Wäscher, G. (Eds.): Operations Research Proceedings 2002, Selected Papers of the International Conference on Operations Research (SOR 2002), Klagenfurt, 2.-5.9.2002, Springer-Verlag, Berlin u.a., S. 302-307
  • Schultmann, F.; Engels, B.; Rentz, O. (2002): Reverse Supply Chain Management for Spent Batteries, in: Christiansen, K. J.; Boer, H. (Eds.): Proceedings of the 9th International EurOMA Conference Operations Management and the New Economy, Copenhagen, 02.-04.06. 2002, S. 1277-1291
  • Schultmann, F.; Fröhling, M.; Rentz, O. (2002): Modellierung und Implementierung von Stammdaten für die Demontageplanung und -steuerung mit ERP-Systemen, in: Chamoni, P.; Leisten, R.; Martin, A.; Minnemann, J.; Stadtler, H., (Eds.): Operations Research Proceedings 2001 Selected Papers of the International Conference on Operations Research (OR 2001), Duisburg, September 3-5, 2001, Springer-Verlag, Berlin u.a., S. 67-74
  • Schultmann, F.; Engels, B.; Rentz, O. (2001): Integrierte Logistik- und Verwertungsplanung beim Produktrecycling, in: Sebastian, H.J.; Grünert, T. (Hrsg.): Logistik Management: Supply Chain Management und e-Business, Teubner-Verlag, Stuttgart, Leipzig, Wiesbaden, S. 197-209
  • Jochum, R.; Schultmann, F.; Rentz, O. (2000): Entwicklung eines Planungsmodells zur Bestimmung umweltorientierter Investitionsprogramme, in: Operations Research Proceedings 1999: Selected Papers of the Symposium on Operations Research (SOR '99), 1.-3.9.1999, Magdeburg, Springer Verlag, Berlin, Heidelberg, New York, S. 542 - 547
  • Schultmann, F.; Rentz, O. (1999): Logistikmanagement auf Basis kapazitätsbeschränkter Projektplanungsmodelle - dargestellt am Beispiel der Baustellenfertigung, in: Kopfer, H.; Bierwirth, C. (Hrsg.): Logistik Management: Intelligente I+K Technologien, Springer-Verlag, Berlin, Heidelberg, S. 51 - 60

 

B. Beiträge auf Basis begutachteter Abstracts bzw. Kurzfassungen / Contributions on the Basis of reviewed Abstracts / Contributions basées sur des résumés examinés

  • Bartusch, H.; Schwaderer, F.; Fernandez Alcalde, A. M.; Fröhling, M.; Schultmann, F. (2011): Impact of recycling measures on resource- and energy efficiency and greenhouse gas emissions in the iron, steel and zinc industry. In: Proceedings of the European Metallurgical Conference 2011, Düsseldorf, 26.-29. Juni 2011, S. 1539-1552.
  • Ilsen, R.; Fröhling, M.; Schultmann, F. (2010): Bewertung politischer Instrumente zur Luftreinhaltung mit Hilfe des Nationalen Integrated Assessment Modells otello. In: VDI-Berichte 2110: Emissionsminderung 2010, Düsseldorf, S. 211-214.
  • Fröhling, M.; Bartusch, H.; Schwaderer, F.; Schultmann, F. (2009): An integrated Approach to enhance Energy and Resource Efficiency and reduce Greenhouse Gas Emissions in the Iron, Steel and Zinc Industry. In: Proceedings of European Metallurgical Conference EMC 2009, Innsbruck, Juni, S. 53 - 68
  • Fröhling, M.; Kerdoncuff, P.; Rentz, O. (2009): Scenario Analyses of Logistical Concepts for 2nd Generation Biofuels, in: Challenges for Sustainable Biomass Utilisation: Proceedings of the Chilean-German Biociclo Workshop, Karlsruhe, 26.-27. März, KIT Scientific Publishing, Karlsruhe, S. 123-134.   
  • Haase, M.; Skott, S.; Fröhling, M. (2009): Ecological evaluation of selected 1st and 2nd generation biofuels – FT fuel from wood and ethanol from sugar beets, in: Challenges for Sustainable Biomass Utilisation: Proceedings of the Chilean-German Biociclo Workshop, Karlsruhe, 26.-27. März, KIT Scientific Publishing, Karlsruhe, S. 69-94.
  • Haase, M.; Fröhling, M.; Schweinle, J.; Himmelreich, B. (2009): Lignocellulosic biomass for the production of platform chemicals – economic and ecological assessment of a biorefinery concept, in: Proceedings of the Second Latin American Congress on Biorefineries: Materials and Energy, Concepción, 4.-6. Mai 2009.
  • Haase, M.; Fröhling, M.; Schweinle, J.; Himmelreich, B. (2009): Techno-economic and ecological evaluation of a wood Biorefinery, in: Kamm, B.; Hempel, M., Erb, R. (2009): Biorefinica 2009 - Biobased products and biorefineries - Proceedings and Lectures.
  • Fröhling, M.; Schwaderer, F.; Rentz, O. (2008): Production Planning under Economic and Ecologic Objectives - A comparison in Case Studies from Metals Production. In: /Abstract Guide of the Operations Research 2008, annual conference of the German Operations Research Society (GOR)/, Augsburg, September 03-05, 2008, S. 93.
  • Fröhling, M.; Haase, M.; Rentz, O. (2008): Raw material logistics for biorefineries. In: Program and Abstracts of IFORS 2008 Sandton, 18^th Triennial Conference of the International Federation of Operational Research Societies, July 13-18, 2008, Sandton, S. 57.
  • Fröhling, M.; Hiete, M.; Rentz, O., Ilsen, R., Comes, T (2008); Otello - Entwicklung eines Integrated Assessment Models für ein nationales Emissionsmanagement. In VDI (Hrsg.): Emissionsminderung 2008 -- Stand -- Konzepte -- Fortschritte, VDI-Bericht 2035, VDI Verlag, Düsseldorf, S. 241-245.
  • Haase, M.; Fröhling, M.; Rentz, O. (2008): Modelling of material and energy flows for the techno-economic and ecological evaluation of a wood Biorefinery with umberto. In ifeu (Hrsg): 13. Umberto-User Workshop, September, 16-17, Hamburg.
  • Fröhling, M., Haase, M., Rentz, O. (2008): A methodical approach for the techno-economic and ecological evaluation of the value chain of biorefineries. In: Proceedings of the 2008 Nordic Wood Biorefinerie Conference, 11 - 14 March 2008, Stockholm, p. 202 - 203
  • Fröhling, M.; Bartusch, H.; Rentz, O. (2007): Integrated Planning of the Recycling of EAF dusts, in: Hilty, L. M.; Edelmann, X.; Ruf, A. (eds.): R'07 World Congress - Recovery of Materials and Energy for Resource Efficiency, September 2007, Davos, Switzerland. Empa Materials Science and Technology, St.Gallen 2007
  • Fröhling, M.; Bartusch, H.; Rentz, O. (2007): Enhancement of Energy and Resource Efficiency and Reduction of Greenhouse Gas Emissions in the Iron and Steel Industry and the Zinc Industry, in: Proceedings of European Metallurgical Conference EMC 2007 - Vol 4, Düsseldorf, 11-14th June 2007, S. 2036-2037
  • Fröhling, M.; Hiete, M.; Rentz, O. (2007): otello - an integrated assessment model to support clean air policy in Germany, in: Program and Abstracts of ESEE 2007 - Integrating natural and social sciences for sustainability, Leipzig, 5-8th June 2007, S. 90, [Abstract] .
  • Zhang, K.; Fröhling, M.; Rentz, O. (2007): Determining factors for the planning of an electronic waste takeback and recycling network in China, in: Proceedings of the 2nd International Conference ECO-X 2007: Sustainable Recycling Management & Recycling Network Centrope, Vienna, May 9-11 2007, ISBN: 978-3-200-00920-2, S. 141-148.
  • Kerdoncuff, P.; Fröhling, M.; Rentz, O. (2007): Stoffliche, energetische und ökonomische Bewertung einer Prozesskette zur Herstellung von synthetischen Biokraftstoffen, in: Proceedings of the "Waste to energy" Conference 2007, Bremen, 09.-10.05.2007, S. 172-175.
  • Fröhling, M.; Hiete, M.; Rentz, O. (2007): An Integrated Assessment and Allocation Model to Support Air Emissions Management in Germany, poster presentation on the Dustconf2007 - How to improve air quality, Maastricht, 23rd-24th April 2007, [Abstract].
  • Fröhling, M.; Rentz, O. (2007): Bottom-up Approaches for the Modelling of Industrial Networks - Examples from Metals Production and Recycling and Biomass Utilization, in: Proceedings 1st International Seminar on Society and Materials SAM1, Sevilla 06.-07.03.2007
  • Hiete, M; Lützkendorf, Th.; Fröhling, M.; Rentz, O. (2007): Ecodesign in the Construction Sector, in: Proceedings 1st International Seminar on Society and Materials SAM1, Sevilla 06.-07.03.2007
  • Zhang, K.; Fröhling, M.; Rentz, O. (2007): Planung eines Rücknahme- und Recyclingsystems für Elektro- und Elektronikschrott in China, in: Thomé-Kozmiensky, K. J., Versteyl, A.; Beckmann, M. (2007): Produktverantwortung - Verpackungsabfälle, Elektro- und Elektronikaltgeräte, Altfahrzeuge, TK Verlag Karl Thomé-Kozmiensky, Neuruppin, S. 339-350.
  • Fröhling, M., Rentz, O. (2006): Integrated Planning of the Recycling of EAF-dusts, Abstract Guide of the Operations Research 2006, annual conference of the German Operations Research Society (GOR), Karlsruhe, 06.-09.09.2006, S. 100
  • Fröhling, M., Rentz, O. (2006): Operational Production Planning of Metallurgical Processes - Combining Flowsheet Simulation and Mixed Integer Programming, in Program and Abstracts of the 21st European Conference on Operational Research, Reykjavik, Iceland, 02.-05.07.2006, S. 146-147
  • Fröhling, M.; Schultmann, F.; Nebel, F.; Rentz, O. (2004): Burden Mix Optimisation for Metallurgical Recycling Processes, in: Proceedings of the 18th International Conference Informatics for Environmental Protection EnviroInfo 2004, Geneva, 21.-23.10.2004, S. 313-323.
  • Fröhling M., Schultmann, F., Rentz, O. (2003): Mass and Energy-flow Orientated Master Production Scheduling, in Program and Abstracts of the Operations Research 2003, annual conference of the German Operations Research Society (GOR), Heidelberg, 03.-05.09.2003, S. 103
  • Engels, B., Schultmann, F., Rentz, O. (2002): Using flowsheet-based process simulation to develop innovative strategies for waste utilisation in the metal industry, in: Lorber, K.-E., et al. (Hrsg.): DepoTech 2002, Verlag Glückauf GmbH, Essen 2002, S. 335-342
  • Schultmann, F.; Zumkeller, M.; Rentz, O. (2002): Kombinierte Touren- und Standortplanung in der Kreislaufwirtschaft, dargestellt am Beispiel der Altautoverwertung, in: Schenk, M.; Ziems, D.; Inderfurth, K. (Hrsg.): Logistikplanung und -management, Begleitband zur 8. Magdeburger Logistiktagung "Logistik aus technischer und ökonomischer Sicht", Magdeburg, 14.-15.11.2002, S. 172-187
  • Schultmann, F.; Engels, B.; Fröhling, M.; Nebel, F.; Rentz, O. (2002): Best Available Techniques and Decision Support Tools to Cope with Wastes in the Metal Industry, in: GVC VDI-Gesellschaft Verfahrenstechnik und Chemieingenieurwesen (Eds.): Preprints of the European Conference "The Future of Waste Management in Europe", Strasbourg, 07.-08.10.2002, Fuck Druck, Koblenz, S. 357-360
  • Schultmann, F., Engels, B., Rentz, O. (2002): Cleaner Technology by Using Flowsheet-Simulation for Decision Support in Process Industries, in: Pillmann, W, Tochtermann, K. (Eds.): EnviroInfo Vienna 2002: Proceedings of the 16th International Conference Informatics for Environmental Protection - Environmental Communication in the Information Society, ISEP, Vienna 2002, S. 459-466
  • Schultmann, F.; Zumkeller, M. Rentz, O. (2002): Betriebswirtschaftliche Bewertung von Produkt- und Stoffkreisläufen auf Basis von Lebenszykluskonzepten und Prozesskostenrechnung, in: Fichtner, W.; Geldermann, J. (Hrsg.): Einsatz von OR-Verfahren zur techno-ökonomischen Analyse von Produktionssystemen, Proceedings zum Workshop der GOR- Arbeitsgruppe OR im Umweltschutz, Peter Lang Verlag, Frankfurt a.M., S. 5-19
  • Schultmann, F.; Fröhling, M.; Rentz, O. (2002): Dismantling and Recycling Planning with ERP-Systems, Proceedings of the R'02 - 6th Conference on Integrated Resources Management, 12.-15.02.2002, Geneva, Switzerland
  • Engels, B.; Schultmann, F.; Rentz, O. (2001): Collection & Recycling of Spent Batteries - Results of a Research Project on behalf of the German Federal Environmental Agency, in Proceedings of the International Congress for Battery Recycling, Montreux, Switzerland, 2.-4.5.2001
  • Schultmann, F.; Engels, B.; Rentz, O. (2000): Planung von Logistiksystemen für die Verwertung von Batterien, in: Logistik 2000plus: Herausforderungen, Trends, Konzepte, 6. Magdeburger Logistiktagung, Magdeburg, 16.-17.11.2000, S. 152-166
  • Schultmann, F.; Rentz, O. (1999): Material flow based deconstruction and recycling management for buildings, in: Proceedings of the R'99 International Congress Recovery, Recycling, Re-integration, Genf, 2.-5.2.1999, Bd. 1, S. 253 - 258

 

C. Eingeladene Beiträge / Invited Contributions / Contributions invitées

  • Comes, T.; Doll, C.; Fröhling, M.; Hiete, M.; Ilsen, R.; Krail, M.; Lützkendorf, T.; Schultmann, F.; Stengel, J.; Unholzer, M. (2010): Otello – a national integrated assessment model for Germany. In: Ökologisches Wirtschaften, 25 (2010) 2, S. 34-37.
  • Fröhling, M.; Bartusch, H.; Schwaderer, F.; Schultmann, F. (2009): An Inter-company approach to improve resource and energy efficiency and reduce greenhouse gas emissions in metal industries by linking flow sheet models, in: World of Metallurgy – Erzmetall, 66 (2009) 5, S. 288-298.  
  • Schweinle, J.; Fröhling, M. (2008): Rohstofflogistik für Bioraffinerien -- Das Beispiel Holzlogistik. In Dechema e.V. (Hrsg.): Industrielle Nutzung nachwachsender Rohstoffe, Frankfurt.
  • Fröhling, M.; Rentz, O.(2007): Integrated Environmental Protection - an European Perspective on Cleaner Production, Absharon Summer School of Applied Ecology, Baku, 7th - 12th September 2007
  • Schultmann, F.; Zumkeller, M.; Rentz, O. (2004): Integrating Spent Products' Material into Supply Chains: The Recycling of End-Of-Life Vehicles as an Example, in: Dyckhoff, H.; Lackes, R.; Reese, J. (Eds.): Supply Chain Management and Reverse Logistics. Springer Verlag, Berlin, Heidelberg, 2004, S. 35-59
  • Schultmann. F.; Jochum, R.; Schmittinger, A.; Rentz, O. (2001): Bestimmung bester verfügbarer Techniken gemäß IVU-Richtlinie - das Beispiel der deutschen Keramischen Industrie, in: Reiter, S. (Hrsg.): Neue Wege in der UVP: novellierte UVP-Gesetzgebung und innovative Methodik, Verlag Irene Kuron, Bonn, S. 183-203
  • Schultmann, F.; Rentz, O. (1999): Kombinierte Methoden von Rückbautechnologien, Stoffstrommanagement und Ablaufplanung, in: Brickwedde, F. (Hrsg.): Stoffstrommanagement - Herausforderung für eine nachhaltige Entwicklung, Osnabrück, S. 319 - 342

 

III. Eigenständige Schriften / Books / Livres

 

IV. Forschungsberichte / Research Reports / Rapports de recherche